Crane Dominates at Tower Wharf

Crane
Control valves for the heating and air-conditioning systems in this Development at Bristol are being supplied by Crane Fluid Systems.
Crane’s Z3000 Dominator flow-management system for fan-coil units is among a full range of control valves being supplied by Crane Fluid Systems for management of the heating and air-conditioning systems for Tower Wharf on Bristol’s floating harbour district. This 6-storey office development of 6600 m2 has a 4-storey glazed atrium entrance and distinctive waterfront elevation. The Dominator system combines all required valve components and connecting pipework into one unit, fully assembled and ready to connect.
Related links:



modbs tv logo

New Sustainability Director for Wates Group

Wates Group, a family-owned development, building and property maintenance company, has appointed Cressida Curtis as its new Group Sustainability Director.

Domus Ventilation appoints new contractor sales managers

Ventilation systems manufacturer Domus Ventilation has announced the arrival of three new Contractor Sales Managers.