Prater adds solarPV to BSkyB building

Prater, solar, pv, photovoltaics, renewable energy

Following a previous successful project at BSkyB’s Grant Way campus, lead contractor Mace awarded Prater a further contract to design and install a solarPV system for Building 2. Off-site manufacture was used to streamline on-site operations and assemble components to generate this contractor’s largest PV power output to date at 462 kW.

The installation comprises 1372 solarPV modules covering 2260 m2 of roof. The work was carried out in two phases and contributes to the BREEAM Excellent rating for the buildings.

For more information on this story, click here: March 2016, 131
Related links:
Related articles:



modbs tv logo

Nathan Wood on chairing the BESA Health & Wellbeing Group

BESA Group Chair Nathan Wood on what the Health & Wellbeing in Buildings Group aims to achieve.

BESA National Conference 2019

BESA chief executive David Frise discusses the BESA National Conference 2019. Find out what's coming up.

Calendar