Manchester Aquatics Centre cuts the cost of dehumidification

Indoor air quality, IAQ, Munters, desiccant dehumidifier

The refurbishment of three Munters desiccant dehumidifiers at Manchester Aquatics Centre has reduced running costs by about 20%, while preserving the building fabric and optimising comfort. The project involved replacing all major components, replacing the old reactivation ductwork with polypropylene and retrofitting the dehumidifers with Munters energy-recovery purge technology to reduce running costs.

Maintained by Serco Leisure, Manchester Aquatics Centre comprises a 50 m swimming pool, 25 m diving pool and a leisure pool with two water flumes. It is home to the City of Manchester Swim team and the GB water-polo team. Another 50 m swimming pool is used by the GB disability team.

The need to refurbish and upgrade the dehumidifiers arose during discussions around routine maintenance. Andy Dove, Munters service area manager says ‘Ensuring humidity is maintained to 55% RH helps to protect the building from costly damage and ensures a comfortable environment for swimmers. Accurately controlling RH in and around the pool is essential to preventing condensation on walls, ceilings and windows, which can lead to mould growth and result in unnecessary building maintenance and repairs.’

Munters engineers worked with Manchester Aquatics Centre to adapt the proposed solution to use polypropylene instead of stainless steel for the reactivation exhaust ductwork at the customer’s request.’

For more information on this story, click here: December 2013, 100
Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.