Andrews Sykes meets BBC cooling needs

As part of the relocation of 750 BBC staff, equipment and assets from Pebble Mill to a predominantly open-plant environment at the Mailbox in the heart of Birmingham, Andrews Sykes provided three 500 kW chillers to meet the cooling needs of the building during fit-out. The building contractor was already using other equipment from Andrews Sykes, so an enquiry was made about a solution for temporary chiller capacity. After a brief assessment of requirements by Andrews Sykes, three 500 kW chillers were installed outside at the rear of the building and connected to the main chilled-water supply using wire-armoured pipe.
Related links:



modbs tv logo

First keynote speakers announced by Europump

The first two keynote speakers have been announced for an annual event being hosted by the British Pump Manufacturers Association (BPMA).

‘Landmark’ prosecution of online seller welcomed by REFCOM

The air conditioning and refrigeration industry’s largest safety register REFCOM has welcomed the successful prosecution of online sales company Appliances Direct (AD) for breaching F-Gas Regulations.