Mikrofill helps Premier Inn move from oil to gas
The huge programme of development of the Premier Inn at Norman Cross on the A1(M) near Peterborough includes a whole new plant room fitted out with Mikrofill boilers and hot-water system. The equipment was installed by Pipetech Mechanical.
The first stage was to remove the old oil-fired boilers and fuel store, followed by the installation of an LPG supply.
Two Mikrofill stainless steel condensing boilers with a maximum output of 700 kW and modulating down to 35 kW were installed.
These boilers generate heat for the 99 bedrooms and numerous conference suites. They also provide LPHW to a bank of Rapid Extreme hot-water loading systems, which ensure boilers remain in condensing mode to maximise efficiency while delivering over 2570 l/h of DHW at 60°C.