Voltage optimiser cuts electricity bills by 17.3%

An immediate 17.3% reduction in electricity consumption has been achieved following the installation of a voltage optimiser at Peasley Cross Hospital in St Helens. Before the installation of the equipment from Streamline Power, the average voltage on site was 246.3 V, peaking at 252.8 V —close to the legal maximum of 253 V. The voltage optimiser has reduced the voltage to 223 V, balanced the incoming phases and controlled the incoming voltage to within 0.5% of target.

The project will pay for itself in 32 months and deliver an internal rate of return of 39%.

Installation took two working days, and the electricity supply was switched over during a period of low demand in the working day.

For more information on this story, click here: December 2011, 81
Related links:
Related articles:



modbs tv logo

First keynote speakers announced by Europump

The first two keynote speakers have been announced for an annual event being hosted by the British Pump Manufacturers Association (BPMA).

‘Landmark’ prosecution of online seller welcomed by REFCOM

The air conditioning and refrigeration industry’s largest safety register REFCOM has welcomed the successful prosecution of online sales company Appliances Direct (AD) for breaching F-Gas Regulations.