Flex Connectors delivers fast-pace light treatment for health centre

Flex Connectors
Over 3000 items from the Flex 7 range of Flex Connectors have been used in the lighting installation of the new Aldershot Centre for Health.
The flexibility and speed of installation of lighting-connection units, sockets and prewired plugs from Flex Connectors has led to their use throughout all four levels of the new £28 million Aldershot Centre for Health. It covers nearly 13 000 m2, has 770 rooms and uses over 3000 items form the Flex 7 lighting connection range. Briggs & Forrester, leading M&E contractor, chose this range for the project because of its experience with the healthcare sector. Also important was that the design of Flex 7 products enables them to be adapted for specific projects. For this project Flex Connectors tailored its standard connection units to provide essential/non-essential connection for the power management required in a healthcare facility and to connect emergency luminaires for central testing and monitoring.
For more information on this story, click here: October08, 143
Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.