MHS Boilers meet efficiency demands of Gatwick Pier 6

Boiler
The operational features of Ultramax gas-fired condensing boilers from MHS Boilers provide energy-efficient heating for the new Pier 6 development at Gatwick Airport.
To help meet requirements for maximum heating efficiency with low emissions for the new Pier 6 development at Gatwick Airport, NG Bailey has installed Ultramax gas-fired condensing boilers from MHS boilers. To meet the fluctuating heating requirement of this project, the heat output of these boilers is fully variable down to 25% of full output. Low emissions are achieved using a downward-firing pre-mix water-cooled burner with precise mixing of gas and air. Combustion in a burner is normally at 1500°C, but system water in the Ultramax burner reduces the temperature to 1200°C. Nox emissions are less than 54 mg/kWh (30 ppm DAF), with carbon monoxide less than 19 mg/kWh (15 ppm DAF). Pier 6 is the largest project at Gatwick since the construction of the North Terminal. This passenger bridge spans a taxiway under which a Boeing 747-400 plane can pass. It connects the North Terminal with 11 new aircraft stands served by piers.
Related links:



modbs tv logo

New Sustainability Director for Wates Group

Wates Group, a family-owned development, building and property maintenance company, has appointed Cressida Curtis as its new Group Sustainability Director.

Domus Ventilation appoints new contractor sales managers

Ventilation systems manufacturer Domus Ventilation has announced the arrival of three new Contractor Sales Managers.