Radiant heating for the Blackpool Illuminations

AmbiRad, radiant heating
Behind the scenes of the extravaganza that is Blackpool Illuminations is the newly built huge Blackpool Lightworks, heated by a radiant installation from AmbiRad.

A new facility to produce and store the Blackpool illuminations has its heating provided by radiant heating supplied by AmbiRad. Called Blackpool Lightworks, the 11 000 m2 building has been built to house £10 million-worth of fibre optics, laser and illumination exhibits. It also houses workshops, spray booths, storage and offices. A feature of the building is its high ceilings for the creation and testing of large exhibits and lighting pieces.

In a building of this size, wall-mounted heating would not be cost efficient or powerful enough. Underfloor heating was precluded because it would have to support the weight load of a 16 t articulate lorry and over 700 t of equipment.

To overcome these problems, AmbiRad supplied five units from its Vision range, with specialist Roger Whalley Ltd appointed to complete the installation.

The heating units are installed in a U-tube herringbone configuration, with just one penetration of the building for flueing combustion projects. Fuel savings of up to 65% can be achieved compared with other types of heating system.

Blackpool Illuminations date back to 1879, with just eight electric arc lamps. Today’s illuminations are a 6-mile extravaganza.

For more information on this story, click here: Nov 2011, 136
Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.