District heating for new London community at St Andrew’s Park

St Andrew's Park, Metropolitan, Vital Energi

District energy specialist Metropolitan and its partner Vital Energi, have been awarded the contract to design, build and operate the district energy network for St Andrew’s Park, the new community being built near Uxbridge in the London Borough of Hillingdon.

Greater London Authority (GLA) building regulations stipulate that the target for both domestic and non-domestic developments in London is for a 35% carbon emission reduction beyond standard building regulations.

This ambition has led to the requirement that developers should prioritise connection to existing or planned district energy networks where feasible, and the Mayor’s expectation is that localised decentralised systems, or district energy networks, will generate 25% of the heat and power used in London by 2025.

Metropolitan’s solution will provide a 30% saving on carbon emissions compared with traditional solution of generating electricity separately and providing heat from individual boilers in homes.

Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.